  1. Military Hospital ABM- laboratory dep, -Doha civil work for complete fit out.
  2. Military Hospital ABM- Radiology dep,/ Ct-scan Room, X-ray Room & Ultrasound Room – Doha: civil work and MEP work for complete fit out.
  3. Military Hospital ABM- Dental dep,- Doha: civil work for complete fit out.
  4. Falcon clinic – Doha: civil work for surgery dep,- Installation of HT –modular room system.
  5. Hamad Medical Corporation HMC/Radiology dep,- X-ray and CT-Scan Room –Doha: complete fit out for civil work and MEP work.
  6. Hamad Medical Corporation HMC /Radiology dep,- MRI Room- Doha: fit out work.
  7. Hamad General Hospital HGH/Heart center – Doha: 4Cathlab, Room area & 1 Hybrid Room area: complete civil work and MEP work starting date: 2011/completion date:2012.
  8. Aspitar Hospital- Radiology dep,- Ct-Scan Room- Doha: civil work for complete fit out.

Projects 2012

Projects 2013

1. Military Hospital ABM- Emergency dep,-Doha: civil work & MEP work for complete fit out

2. Ministry of interior MOI/ Police medical center/ Emergency dep,- Doha: : civil work & MEP work for complete fit out

3. Hamad General Hospital HGH- PET_CT center for Diagnosis & Research- Doha civil work for walling according to health and safety plan

4. Qatar foundation- Medical center- Radiology dep,- Doha: X-Ray-, Ultrasound & panorama Room: complete fit out for civil work and MEP work

Projects 2014

2014

1. Military Hospital ABM- Surgery dep/ 1 operation theater area- shehanyia: complete fit out for civil work with HT-Modular room system

2014

2. Ministry of interior MOI/ Police training institute- Medical center- Doha: Radioligy dep,/ X-Ray- & Panorama Room: complete fit out for civil work and MEP work Medical center: civil work- wall decorative design paint

Projects 2014-2015

2014-2015

2. Anti-Doping lab Qatar ADLQ- Doha: complete fit out for the 3rd floor for civil work including HT-Modular room system & HPL wall system. Starting date:2014/ completion date:2015

2014-2015

1. Military Hospital ABM- Surgery dep/ 1 operation theater area- shehanyia: complete fit out for civil work with HT-Modular room system

Projects 2016 Amazing

  1. Al-AHLI Hospital- Radiology dep,/ X-Ray Room & Fluoroscopy Room-Al-Wakrah: complete fit out for civil work.
  2. Sidra Hospital- Radiology dep,/ X-Ray Room- Doha: complete fit out for civil work.
  3. Alshomoukh Tower –Qatar Gas dental center- Doha: civil work for fit out.
  4. Qatar mall –Carrefour-Doha: civil work for fit out.
  5. Syrian American Medical center- Surgery dep ,- Doha: civil work for fit out.
  6. Hamad Medical Corporation HMC/ Radiology dep,- Doha: IR Angiography Room: Design & planning work.

Projects 2017

2017

1. Al-Ahli Hospital – laboratory dep-Doha: Turkey project for civil & MEP Works for complete new fit out.

2017

2. Al-Ahli Hospital –Cathlab, area –Doha: civil work –Ceiling steel structure for new fit out.

2017

3. HMC Hospital-laboratory dep-Doha: Turkey project for civil & MEP works for complete new fit out.

2017

4. HMC Hospital- Sterilization dep- Doha: Turkey project for civil & MEP works.

Projects 2018

2018

HMC-HBKMC-WWRC/ACC Maintenance the 21 OR,s Area Up 2015 till today

2018

HGH Conference Room (Room 9): fit out for civil and MEP works

Projects 2019

2019

AlEmadi Hospital- MRI Suite: fit out for civil and MEP works

2019

ALEmadi Hospital- X-Ray Room: fit out for civil and MEP works

Projects 2020

  1. HMC-UM Salal Isolation complex-X-RAY Room: fit out for civil and MEP works 
  2. Alkhor Hospital-X-Ray Room : fit out for civil and MEP works 
  3. Turkish armed force Hospital-X-Ray Room: fit out for civil and MEP works 
  4. Turkish armed force Hospital- Dental Room: fit out for civil and MEP works 
  5. Mesiaeed Hospital –X-Ray Room : fit out for civil and MEP works 
  6. HMC-WWRC- Modification-to- procedure-suite- to- from- URODYNAMIC-suite
  7. MOI Police clinic –MRI suite/Quench piping 

Projects 2021

2021

Alkhor Hospital – MRI suite: fit out for civil and MEP works 2020-2021

2021

AMAN Hospital- MRI suite: fit out for civil and MEP works 2021

KSA PROJECTS

Projects 2012 Amazing

2012

King Abdullah Hospital /surgery dep,- Mecca: Civil work for complete installation of HT- Modular room system. Starting date: 2012/ completion date: 2013

Projects 2013 Amazing

2013

1. King Abdul Aziz Hospital/ surgery dep, - Riyadh: civil work for complete installation of HT-Modular room system.

2013

2. King Faisal Hospital/ surgery dep, - Taif: civil work for complete installation of HT-Modular room system.

Projects Description

AL KHOR HOSPITAL – MRI SUITE Better Bigger Faster

 

 

  • Start:2020
  • Finish:2021
  • Client: HMC – AlKhor Hospital
  • Consultant:JCP James Cubitt & Partners
  • Main contractor: Ali Bin Ali Medical
  • Scope of work: Turnkey Project
  • Description: Complete fit out work for Civil & MEP Works
AL KHOR HOSPITAL – X-Ray Room & VIP Patient Room Better Bigger Faster

 

  • Start:2019
  • Finish:2020
  • Client:HMC – AlKhor Hospital
  • Consultant:JCP James Cubitt & Partners
  • Main contractor: Ali Bin Ali Medical
  • Scope of work: Turnkey Project
  • Description:Complete fit out work for Civil & MEP Works
HGH Conference Room ( Room 9 ): Better Bigger Faster

 

  • Start:2018
  • Finish:2018
  • Client: Hamad General Hospital ( HGH )
  • Consultant:HMC Engeniering
  • Main contractor: Ali Bin Ali Medical
  • Scope of work: Turnkey Project including Furniture
  • Description:Complete fit out work for Civil & MEP Works
AlEmadi Hospital – MRI SUITE: Better Bigger Faster
  • Start:2018
  • Finish:2018
  • Client: AlEmadi Hospital
  • Main contractor: Ali Bin Ali Medical
  • Scope of work: Turnkey Project
  • DescriptionComplete fit out work for Civil & MEP Works

HMC – QRI – Lab: Better Bigger Faster Hamad Bin Khalifa city(HMC) /laboratory dept./ Doha

  • Start:2017
  • Finish:2017
  • Client:Hamad Medical city (HMC)
  • Main contractor:Roche Qatar
  • Subcontractor: Montage Island Technology (MIT)
  • Scope of work: Turkey project
  • Description: complete fit out work for civil and MEP works
Hamad Bin Khalifa Medical City Better Bigger Faster Women’s & Ambulatory Hospital – Doha: 21 Operation Theaters including Medical area of 4200m2 on 2nd and 3rd floors

  • Start:2014
  • Finish:2016
  • Client:Hamad Medical city (HMC)
  • Client representative: Ashghal – Public works authority
  • Consultant: KEO International Consultants
  • Main contractor: Hyundai Engineering & Consultants
  • Subcontractor: Montage Island Technology (MIT)
  • Sub-Main Contractor: Ali Bin Ali Medical
  • Scope of work: Civil work – fit out work
  • Description: Complete fit out for the 2nd & 3rd floors for civil work including HT-Modular room system
  • Civil Work: Glass modular wall system, stainless modular steel wall system, GI galvanized ceiling system. Gypsum board ceiling system with anti-bacterial paint, Wall & Ceiling steel supporting system “Atlas”, Window glazing, Glass doors, Stainless steel doors, Wall medical devices, Ventilation system / laminar air flow, Illumination system, LED wall system, Expantion joint solution flooring self-leveling, Vinyl flooring,
  • MEP work:Electrical work connection to the BMS
• ADLQ – Laboratory on 3rd Floor – Doha: Better Bigger Faster
  • Start:2014
  • Finish:2015
  • Client:Anti-Doping Lab Qatar ADLQ
  • Consultant: Universal design Center UDC -Qatari Engineer & Associates QEA
  • Main contractor: Ali Bin Ali Medical
  • Scope of work: Civil work – fit out work
  • Description: Complete fit out for the 3rd floors for civil work including HT-Modular room system & HPL-Polyrey wall system.
  • Civil Work: Stainless steel wall system, GI galvanized ceiling system, Gypsum board ceiling system with anti-bacterial paint, Flooring self-leveling, Vinyl flooring, Window glazing, Stainless steel doors, Polyrey wooden doors, Wall medical devices, Ventilation system / Laminar air flow, Illumination system.
• HIGH – Heart Hospital / 4 Cathlab. Rooms area & 1 Hybrid Room area – Doha: Better Bigger Faster
  • Start:2011
  • Finish:2012
  • Client:Hamad General Hospital HIGH
  • Consultant: HMC – Engineering department-Qatari Engineer & Associates QEA
  • Main contractor: Ali Bin Ali Medical
  • Scope of work: Civil work and MEP work
  • Description:Turnkey project for complete civil work and MEP work.
  • Civil Work: Installation of HT-Modular room system with all related medical devices: HPL – Impact wall system, GI galvanized wall system, wall lead lining, GI galvanized ceiling system, Window glazing, Stainless steel doors, Wall medical devices, Ventilation system / Laminar air flow, Illumination system Wall sound isolation system.
  • Including:Demolishing work for the existing.-Flooring self-leveling, Vinyl flooring,--Ceiling steel structure for heavy medical equipment’s, carpentering work.
  • MEP work:Plumbing work, piping work, ducting work, Electrical work
• Police medical center/MOI- Dental center- Doha: Better Bigger Faster
  • Start:2010
  • Finish:2010
  • Client:Ministry of interior MOI
  • Main contractor: Ali Bin Ali Medical
  • Scope of work: Civil work and MEP work
  • Description:Turkey project for complete building renovation from the planning phase to handing over.
  • Civil Work:Demolishing work for the existing, concrete work Blockwork and Gypsum board work, plastering, Painting, flooring tiles, steel, Stainless steel work, Rooftop Isolation system, Aluminium and Wall cladding works, false ceiling Systems, carpentering work, wall Design& fishing work.
  • MEP work:Plumbing work, piping work, ducting Work, Electrical work
• Villa compound & shopping center at Algharafa- Doha Better Bigger Faster
  • Start:2007
  • Finish:2009
  • Client:Sheikh Hamad bin Abdullah al Thani
  • Consultant:Al-Alameia Engineering consultant
  • Main contractor: Al Badr Group
  • Scope of work: Client representative
  • Description:Turkey project for construction from The planning phase up to handing Over
• King Abdullah Hospital / Surgery dep. – Mezza: Better Bigger Faster
  • Start:2012
  • Finish:2013
  • Client:Ministry of Health K S A
  • Consultant:Hospital engineering department
  • Main contractor: Al Faisaliah Medical Systems FMS
  • Scope of work: Civil work – Fit out work
  • Description:Complete installation of HT-Modular room system with all related medical devices
  • Civil Work:Stainless steel wall system, GI galvanized ceiling system, HPL – Impact wall system, GI galvanized wall system, wall lead lining, Window glazing, Stainless steel doors, Wall medical devices, Ventilation system / Laminar air flow, Illumination system.